1. Puffy membrane structure of high-frequency welding machine According to user needs, choose different high-frequency power of the size of the machine, each welding length and width of the material, can change the length and breadth of high-frequency die width width, film structure to achieve welding needs.
Spray machine with a corresponding span of the inside of the discharge tank, discharge tank span and depth can be selected according to the welding product size to meet the large PVC digester welding, PVC pool welding, PVC children's pool melting , Car awning canvas, outdoor tent cloth, film cloth, membrane structure, outdoor shade cloth, outdoor advertising inkjet cloth, PVC cloth welding connection.
3. Splicer high-frequency oscillation system for the European square coaxial structure, high-frequency output stable and powerful, high frequency welding machine with high frequency 5557 spark protection system to prevent damage to high-frequency welding mold, welding machine welding time may be According to different material thickness freely set, high frequency power output size precision adjustable.
4. Weld firmly, the thickness of the material can be satisfied, the machine deep and wide breadth of grain, convenient large area continuous connection, the machine can rotate continuous pressure line access to melt, the length can be freely customized, the European system of square high-frequency shock box, a greater output ,more stable.
Rock Zhen equipment purchase considerations
Company
Plastic packaging machine, automatic high frequency machine, high frequency, packaging machine heat, high frequency machine, high frequency heat sealing machine, high frequency welding machine, high frequency welding machine, high frequency equipment, fusing machine
About the company
Shanghai Yan Zhen Automation Equipment Co., Ltd. was established in 2006, after more than 10 years of growth and development, the Secretary after several changes, is located in the beautiful scenery and long history of Shanghai Zhujiajiao ancient town of Qingpu District
About equipment
All equipment by our independent research and development production, the first mold proofing, until the customer satisfaction and cooperation
about the price
Equipment prices from different power, configuration, model, craft decisions, subject to negotiation, not allowed to quote
About quality
All equipment parts have been formal channels of procurement, domestic and foreign well-known brand suppliers
About Logistics
Car transport, shipping post I Division commitment (except for special circumstances)
About equipment installation conditions
Customers take delivery and installation by the buyer, before delivery, the buyer must provide gas source, 380V power supply, unloading forklift
About after sales
Equipment from the date of manufacture free of charge year warranty and lifetime maintenance, parts warranty damage or failure to repair equipment failure, the company only charge parts costs and on-site service fee, in the shortest possible time to provide solutions and on-site service
About installation and debugging
Equipment sent by the demand side prior to shipment to the factory inspection, acceptance and sent to the need to plant, Division I will arrange professionals on-site guidance
About delivery time
Standard machines are available from stock, non-standard custom negotiators need to negotiate, delivery time to be required to pay the deposit after the deposit
Contact information
18964959113¡¢13611901916